Members from the Tanker Committee made the trip to Sutphen East to look over the new tanker as the rest of the build is starting to take place. The Hale pump (1500 gpm) is in the pump modular getting discharges and intakes installed, plus working on the pump panel. Also the rear body with the compartments and cut outs are getting fabricated.
Members will be making trips during every stage as the build continues.